Planning Report – 7th November 2011 – Parish Council

  1. PLANNING REPORT SEPTEMBER/OCTOBER 2011

  • FURTHER SITE SPECIFIC ALLOCATIONS FOR MINERAL EXTRACTION HAVE BEEN RECEIVED.  NONE OF WHICH AFFECT SWAINSTHORPE.
  • A CONSULTATION DOCUMENT HAS BEEN RECEIVED REGARDING PROPOSED INFRASTRUCTURE LEVIES ON DEVELOPERS.  ZONE ‘A’ WHICH APPEARS TO INCLUDE SWAINSTHORPE HAS A PROPOSED LEVY OF £135 – £160/ M2 .  EXCLUDING GARAGES FOR WHICH THE PROPOSAL IS £25 – £35 / M2.
  • RESIDENTS AFFECTED BY THE PROPOSAL TO DEVELOP SITES 898 – 962 SHOULD SUBMIT THEIR COMMENTS TO SNDC BEFORE 18TH NOVEMBER.  RESIDENTS ARE ABLE TO ARRANGE A MEETING WITH THE PLANNING TEAM BEFORE THAT DATE TO DISCUSS THEIR CONCERNS.
  • VISIT FROM BTS GROUP WHICH IS THE UK POWER NETWORKS CONTRACTOR RESPONSIBLE FOR CLEARANCE OF TREE AND VEGETATION CLEARANCE LOCAL TO OVERHEAD POWER CABLES.  THE AREAS AFFECTED ARE CLOSE TO THE RECYCLING CENTRE ADJACENT TO THE GRANARY AND THE BARN.  PERMISSION WAS GIVEN ON BEHALF OF THE P.C. TO TRIM THE TREE BRANCHES IN THESE AREAS.

One Response to Planning Report – 7th November 2011 – Parish Council

  1. Hi great post keep up doing great work. Pubanswers

Leave a Reply

Comments are moderated. This may take some time as there is no full time moderator for this site.

Your email address will not be published. Required fields are marked with a *